プレカンファレンスフォーカスデイy: 2012年2月27日, 月曜日

08.30 Registration & welcome coffee

08.50 Opening remarks from the chair

Asset owners/Project Heads of SPVs discuss details of the metro rail projects:

  • Project description
  • Civil infrastructure – tracks, stations and depots
  • Details of tunnel/elevated structures – tenders and contracts
  • Fire and ventilation safety systems
  • Equipment details – Rolling stock, S & T, Telecommunication & Transmission, SCADA
  • Auxiliary systems
  • Project completion schedules
  • Future expansion plans

09.00 BANGALORE METRO, INDIA

Sudhir Chandra
Project Director
BANGALORE METRO RAIL CORPORATION

09.40 XPRESS RAIL LINK, HONG KONG

Bill Clowes
Project Manager – Construction - XRL
MTR CORPORATION

10.20 PANEL DISCUSSION: Engineering future-proof metro rail systems in Asia

  • Combining best practices with Asian skills in improving metro rail engineering and construction efficiency
  • Understanding decision criteria on gauge, rolling stocks, elevated vs. tunnel
  • Improving efficiency in stakeholder coordination
  • Achieving sustainability in engineering, construction and maintenance

Panelists:

Bill Clowes
Project Manager – Construction - XRL
MTR CORPORATION

Sudhir Chandra
Project Director
BANGALORE METRO RAIL CORPORATION

Martin Knights
Global Technical Director – Tunnelling
HALCROW

Kuldeep Ranka
Managing Director
JAIPUR METRO RAIL CORPORATION

11.00 Morning tea & networking break

11.30 Global Influences for tunnelling projects

  • Good examples of the use of underground space
  • How technological innovation is broadening the choice of underground construction
  • Metro and rail projects in South Asia
  • London Underground Station Construction – Case study
  • Trends in global tunnel market

Martin Knights
Global Technical Director – Tunnelling
HALCROW

12.10 Updates on ballast bonding technology to reduce noise/ pollution and to increase ballast bed stability

  • Increasing of the ballast bed stability
  • Increasing of the ballast resistance
  • Improving the vertical and horizontal load distribution
  • Change of elasticity/stiffness of ballast bed (noise reduction)
  • Reduction of ballast loosening (dust reduction)

Peter Simons
Chief Engineer - International Applications
MINOVA INTERNATIONAL

12.50 Lunch and networking break

13.50 JAIPUR METRO, INDIA

Kuldeep Ranka
Managing Director
JAIPUR METRO RAIL CORPORATION

14.30 PANEL DISCUSSION: Sustainable and cost efficient construction techniques for metro rail structures

  • Understanding the project demands in deciding construction methodologies for elevated structures vs. tunnels
  • Effective project management vs. cost management
  • Risk management in EPC contracting for metro rail infrastructure
  • Identifying equipment, material and sub-contractors for fast project completion
  • Ensuring early stakeholder coordination

Moderated by:

Martin Knights
Global Technical Director – Tunnelling
HALCROW

Panelists:

Bill Clowes
Project Manager – Construction - XRL
MTR CORPORATION

Sudhir Chandra
Project Director
BANGALORE METRO RAIL CORPORATION

Liu Kading
Chief Engineer
SHENZHEN METRO 3 LINE INVESTMENT COMPANY

15.10 Afternoon tea & networking break

15.40 SHENZHEN METRO, CHINA

Liu Kading
Chief Engineer
SHENZHEN METRO 3 LINE INVESTMENT COMPANY

16.20 HANOI METRO, VIETNAM

Tran Van Luc
Director – Railway Project Management
VIETNAM RAILWAY ADMINISTRATION

17.00 KOLKATA METRO, INDIA

Subrata Gupta
Managing Director
KOLKATA METRO RAIL CORPORATION

17.40 Chair’s summary with Q & A

17.50 End of focus day

Choose your language
English
Traditional Chinese
Simplified Chinese
Korean


Construction IQ

Sponsors

_sponsors

Media partners

_media
イベントカレンダー
建築/土木関連の国際会議

建築/土木関連の国際会議